Assembly needs: 10mm spanner, spirit level, rubber mallet. Steps: lay out components, assemble base frame, add top frame, add shelf levels, check square and level, tighten all nuts, install bracing, place shelves, anchor to floor. 20-30 minutes per unit with 2 people.
Contact: +91 9819367366 | uniquerack74@gmail.com | A/15, 1st Lane, M.S. Ali Road, Mumbai 400008